Lid for pallet 820x1220 Height 69.5mm Injection moulded
| Injection moulded lid | External 1220X820X69,5 |
| Intenal 1210X808X30 | Weight 5,1 kg |
| Polypropylene | Recyclable |
For UK, ask for your quote
Logo Printing optional
RIFD optional
| 600x800 | Thermoformed | 1000x1200 | |
- Product Category
- Lid for plastic crate
- Dimension Category
- 800 X 1200
- Plastic Pallet Information
- (*) More details ? Please download our Technical Specification
- Raw material
- HDPE Recycled
- Color
- Black
- Activity Sectors
- All
Yes. Plastic pallets are recyclable. Mostly made from recycled HDPE, they can be reintroduced into a recycling stream at the end of their life to be used in the manufacture of new plastic products.
Yes. Plastic pallets are suitable for export. Made of plastic, they are not subject to the ISPM 15 standard and do not require any phytosanitary treatment. They are a reliable solution for international shipments.
MyPalletsOnline offers plastic pallets in several sizes to meet different logistical needs. The available dimensions are listed on each product page. If you are looking for a specific size, contact our Support to be advised.
Delivery times vary depending on the product ordered. They are indicated on each product page. For custom-made products, the delivery time is specified in the quotation.
- For Bulk bag, delivery times range from 48 hours to 7 days after the order has been prepared. The delivery time also depends on the quantity, and therefore the weight, as well as the destination country. 48 hours is the minimum delivery time for a parcel weighing less than 30 kg delivered in France. The longest delivery time we have observed is 10 days for an order weighing more than 30 kg delivered to Denmark.
- For Presswood Pallet, delivery times are between 7 and 10 days. For the 800x800 and 1000x1000 sizes, a lead time of 3 weeks is required.
- For plastic Pallet, our delivery times are 7 to 10 days
- For plastic crates, our delivery times are 7 to 10 days
These delivery times do not apply to bespoke production. Furthermore, despite our agreements with our transport partners, we cannot be held responsible for delays in transit.